60
9 Analytical Quality Assurance (AQA)
Example: Report output
→
Insert the test cell.
PipeCheck OK ...
...or error message
After approx. 5 s:
→
Return to the AQA check menu using
.
AQA check
PipeCheck
15.06.99
15:38
Operator:
PipeCheck
result
--------------------------------------------
3.0 ml
PipeCheck ok
If a test cell unsuitable for the reference
cell is inserted, the meter does not accept
it and still displays: insert test cell.
Summary of Contents for PhotoLab Spektral
Page 2: ......
Page 32: ......
Page 38: ...8 List of contents...
Page 128: ...98 13 User defined methods...
Page 132: ...102 14 Photometer setup...
Page 140: ...110 16 RS 232 C interface...
Page 144: ...114 18 Exchanging the Memory Card...
Page 152: ...122 21 Appendix 21 1 Menu structure of the setup menu...
Page 153: ...123 21 Appendix...
Page 154: ...124 21 Appendix...
Page 160: ......
Page 161: ......