5.1
PRE-COMMISSIONING CHECKS
▶ Check that the gas service pipe and water pipes are connected to the
correct position on the manifold.
1. Gas inlet (22mm)
2. Flow (22mm)
3. Return (22mm)
Fig. 50
▶ Check the gas type specified on the identification plate matches that
of the gas supply.
▶ Turn on the main gas supply, check the gas pipe work, connections
and rectify any leaks.
▶ Check that the condensate pipe has been connected to the siphon.
▶ Ensure that the condensate pipe has been inserted at least 25mm into
the elbow
Fig. 51 Condensate connection
5.2
FILLING THE SYSTEM
Open vented systems:
▶ Ensure all system and boiler drain points are closed.
▶ Open all radiator valves.
▶ Turn on the water supply to the system header tank and allow the
system to fill.
Sealed systems:
▶ Fill the system via a WRAS approved filling loop to 1 bar then turn the
valve anti-clockwise to close.
Opened vented and sealed systems:
▶ Air will be removed from the boiler heat exchanger via the Auto Air
Vent mounted on top of the heat exchanger.
▶ Vent all radiators and the primary side of the hot water cylinder,
tighten when completed and check the system and correct any leaks.
Sealed systems only:
▶ If required increase system pressure back to 1 bar.
▶ Isolate and remove filling loop connection to system.
5.3
WATER TREATMENT
ENSURE THAT THE SYSTEM HAS BEEN CLEANED AS ON PAGE 9 OF
THESE INSTRUCTIONS
.
FLUSHING (Central Heating):
▶ Switch off the boiler.
▶ Open all drain cocks and drain the system while the appliance is hot.
▶ Close drain cocks and add a suitable flushing agent at the correct
strength for the system condition in accordance with the
manufacturer's instructions.
▶ Run the boiler/system at normal operating temperature for the time
stated by the manufacturer of the flushing agent.
▶ Drain and thoroughly flush the system to remove the flushing agent
and debris.
INHIBITOR (Central Heating):
▶ Check drain cocks are closed and all radiator valves are open before
adding a suitable inhibitor compatible with aluminium (or combined
inhibitor/anti-freeze if the system is exposed to freezing conditions)
to the heating system water in accordance with the manufacturers
instructions.
▶ Fill system as described in section 5.2.
▶ Set all controls to maximum.
▶ Record the date when the inhibitor was added to the system.
WATER TREATMENT
Suitable water treatment products can be obtained from the following
manufacturers:
WARNING:
ELECTRIC SHOCK
▶ ISOLATE THE MAINS SUPPLIES BEFORE STARTING
ANY WORK AND OBSERVE ALL RELEVANT SAFETY
PRECAUTIONS
NOTICE:
Do not use solvents, adhesive or lubricant
when pushing the pipe onto the rubber connector.
If the boiler is not to be commissioned immediately then,
after successfully completing all of the checks and any
rectification work, shut off the gas and water supply and
electrically isolate the boiler.
6720646610-16.2W
o
1
2
3
6720646610-17.2W
o
25mm
NOTICE:
SOFTENED WATER
▶ ARTIFICIALLY SOFTENED WATER MUST NOT BE
USED TO FILL THE CENTRAL HEATING SYSTEM.
The pH value of the system water must be less than 8 or
the appliance guarantee will be invalidated.
NOTICE:
▶ The concentration of inhibitor in the system should be
checked every 12 months or sooner if system content
is lost.
▶ The addition of sealing agents to the system water is
not recommended as this can cause problems with
deposits left in the heat exchanger.
FERNOX