4.4.3 HANGING THE BOILER
System pipes may be run vertically up behind the boiler or below it.
The boiler mounting points on the wall frame are indicated in figure 28.
Ensure the wall frame sides are not slightly splayed out after mounting;
move the sides in to allow the boiler to slide on to frame.
Fig. 28 Wall frame boiler mounting points
▶ Lift the boiler onto the wall plate.
▶ Ensure that the boiler is presented slightly higher than the wall frame
so that the slots in the boiler frame slide over the mounting points on
the wall frame.
▶ Lower the boiler onto the wall frame mounting point, ensure that the
wall frame mounting points are fully engaged with the slots in the
boiler frame.
Fig. 29 Hanging the boiler on the wall frame
▶ Level vertically using the feet (1) at the bottom rear of the boiler
casing.
▶ Fit retaining screws through the holes (2) in the boiler frame to secure
the boiler.
▶ Make connections to the heating system pipes.
Fig. 30 Levelling and securing detail
4.4.4
CONDENSATE CONNECTION
Never terminate or discharge into any open source, including; sink, bath,
shower, bidet, toilet etc.
Figure 32 gives the pipe work dimensions with respect to the mounting
surface.
▶ Fit the condensate discharge pipe as far back as possible to the wall to
ensure easy fitting of the boiler bottom panel.
▶ Route the condensate pipe to an appropriate discharge point, refer to
section 3.4.
▶ Plumb up to the wall frame with 22mm pipe.
▶ Ensure that there is enough pipe to insert 25mm into the rubber hose
connector. Attach the discharge hose from the siphon to the
condensate drain pipe.
Fig. 31 Connecting and filling the siphon
NOTICE:
Before hanging the boiler.
▶ If pipes require reducing in length this is best done
before they are fitted to the boiler.
NOTICE:
Lifting the boiler.
▶ Lift the boiler using the handling holes at either side of
the frame.
Do not lift the boiler by the air gas manifold or control
box.
6720646610-60.1W
o
6720646610-61.1W
o
NOTICE:
Condensate disposal
▶ Follow the recommendations given in section 3.4
“Condensate pipe work” for all condensate disposal
installation.
▶ Ensure that the condensate pipe work falls at least
50mm per metre towards the outlet.
▶ * Do not use solvents, adhesive or lubricant when
pushing the pipe onto the rubber connector.
6720646610-07.2W