Bioflo

Pellet Central Heating

System Boiler

Supplementary Assembly Instructions

for the UK

Read the Assembly Instruction Booklet and these

Supplementary Instructions carefully before Installation

These instructions together with those supplied with the appliance cover the basic
principles to ensure the satisfactory installation of the boiler.

In all cases the installation must comply with current Building Regulations, Local
Authority Byelaws and other specifications or regulations as they affect the installation
of the boiler. It should be noted that the Building Regulations requirements can be met
by adopting the relevant recommendations given in British Standards BS 8303, BS EN
15287-1:2007 as an alternative means to achieve an equivalent level of performance to
that obtained following the guidance given in Approved Document J.

Please note that it is a legal requirement under England and Wales Building Regulations
that the installation of the boiler is either carried out under Local Authority Building
Control approval or is installed by a Competent Person registered with a Government
approved Competent Persons Scheme. HETAS Ltd operate such a scheme and a
listing of their Registered Competent Persons can be found on their website at
www.hetas.co.uk.

Where ‘Building Regulations’ is quoted this refers to the building regulations for
England and Wales. For Scotland and Northern Ireland use the appropriate Building
Regulations Part F - (Scotland) and Building Regulations Part L - (Northern Ireland).

Codes of Practice - refer to the most recent version

BS 7671:2008 

Requirements for electrical installations. IEE Wiring Regulations.

BS EN 1856 - 1+2 :2003 

Requirements for metal chimneys - System chimney products. - 2:2004 metal liners and

connecting flue pipes.

BS 8303

Code of practice for installation of domestic heating and cooking appliances burning 

solid mineral fuels.

BS EN 15287 - 1:2007

Chimneys. Design, installation and commissioning of chimneys. Chimneys for non-room

sealed heating appliances.

BS 8423: 2002

Fireguards for fires and heating appliances for domestic use. 

BS EN 12831:2003

Heating systems in buildings. Method for calculation of the design heat load

BS EN 12828

Heating systems in buildings.

BS 7593 

Treatment of water in domestic hot water central heating systems

BS EN 14336 

Installation and commissioning of water based heating systems.

BS EN 5546 

Installation of hot water supplies for domestic purposes.

BS EN 7074 

Expansion vessels and ancillary equipment for sealed water systems.

BS EN 13384 - 1+2 :2002.

Chimneys - Thermal & fluid dynamic calculation methods - Chimneys serving one 

appliance.

Health and Safety Precautions

- Special care must be taken when installing the boiler

such that the requirements of the Health and Safety at Work Act are met.

Note:

The addition of anything that may interfere with the normal operation of the

appliance without express written permission from the manufacturer or his agent could
invalidate the appliance warranty. This could also infringe the HETAS Regulations.

Handling

- Adequate facilities must be available for loading, unloading and site handling.

Fire Cement

- Some types of fire cement are caustic and should not be allowed to

come into contact with skin. In case of contact wash immediately with plenty of water.

Asbestos

- This boiler contains no asbestos. If there is a possibility of disturbing any

asbestos in the course of installation then please seek specialist guidance and use
appropriate protective equipment.

Metal Parts

- When installing or servicing this boiler care should be taken to avoid the

possibility of personal injury.

Summary of Contents for Bioflo

Page 1: ...al chimneys System chimney products 2 2004 metal liners and connecting flue pipes BS 8303 Code of practice for installation of domestic heating and cooking appliances burning solid mineral fuels BS EN 15287 1 2007 Chimneys Design installation and commissioning of chimneys Chimneys for non room sealed heating appliances BS 8423 2002 Fireguards for fires and heating appliances for domestic use BS EN...

Page 2: ...m flue gas connector that allows connection to either a suitably lined masonry chimney or a prefabricated factory made insulated metal chimney in accordance with the instructions It will be neccessary to fit an adaptor to the flue gas connector for chimney diameters greater than 125mm Maximum diameter is 150mm Because the boiler operates at high efficiencies the temperature of the flue gases is at...

Page 3: ...ber Combustion Air Supply This is an open flued appliance The air supply can be provided either directly from outside via an air duct or from the room of installation In order for the boiler to perform efficiently and safely there must be an adequate air supply into the room in which the boiler is installed to provide combustion air The provision of air supply to the boiler must be in accordance w...

Page 4: ...iler and the associated heating system must be carried out by a registered competent electrician and in accordance with the requirements of the latest issue of BS 7671 Power cable 3 core to appliance 4 core cable to wiring centre from appliance ie L1 N and E to wiring centre external controls L2 switched live back to the appliance see section 4 7 in Installation Instructioins Frost protection must...

Page 5: ...for suitable trained operatives on 0844 871 1568 WARNING NOTE Properly installed operated and maintained this boiler will not emit fumes into the dwelling Occasional fumes from de ashing and re fuelling may occur However persistent fume emission is potentially dangerous and must not be tolerated If fume emissions persist then the following immediate action should be taken a Open the doors and wind...

Page 6: ...for a prolonged period of time ie during the summer months then it should be given a thorough clean to remove ash and unburned fuel residues Empty the hopper of unburned fuel To enable a good flow of air through the appliance to reduce condensation and to avoid door seals becoming stuck and subsequently damaged leave the filling hatch and combustion chamber doors slightly ajar These actions will r...

Reviews: