30
Dealer Check Lists
MAN1279 (15/04/2019)
DEALER CHECK LISTS
PRE-DELIVERY CHECK LIST
(DEALER’S RESPONSIBILITY)
Inspect the equipment thoroughly after assembly to ensure it is set up properly
before delivering it to the customer.
The following check lists are a reminder of points to inspect. Check off each
item as it is found satisfactory or after proper adjustment is made.
NOTICE
■
Gearboxes are not filled at the factory. Prior to delivery, make sure
each gearbox is filled between lowest ring and end of dipstick with 80 or
90W API GL-4 or GL-5 gear lube.
___
Check that all safety decals are installed and in good condition.
Replace if damaged.
___
Check that shields and guards are properly installed and in good con-
dition. Replace if damaged.
___
Check all bolts to be sure they are properly torqued.
___
Check wheel bolts for proper torque.
___
Check that all cotter pins and safety pins are properly installed.
Replace if damaged.
___
Check that blades have been properly installed.
___
Check and grease all lubrication points as identified in lubrication infor-
mation on page 15.
___
Check the level of gearbox fluids before delivery. Service, if required,
as specified in the lubrication information on page 15.
DELIVERY CHECK LIST
(DEALER’S RESPONSIBILITY)
___
Show customer how to make adjustments and select proper PTO
speed.
___
Show customer how to make sure driveline is properly installed and
that spring-activated locking pin or collar slides freely and is seated in
groove on tractor PTO shaft.
___
Show customer how to determine the turning limits of the CV PTO
driveline.
___
Show customer the safe, proper procedures to be used when mount-
ing, dismounting, and storing equipment.
___
Make customer aware of optional equipment available so that cus-
tomer can make proper choices as required.
___
Instruct customer how to lubricate and explain importance of lubrica-
tion.
___
Point out the safety decals. Explain their meaning and the need to
keep them in place and in good condition. Emphasize the increased
safety hazards when instructions are not followed.
___
Explain to customer that when transporting the cutter, the wing and
center sections should be raised and their respective transport bars
installed and pinned in place.
___
Present Operator's Manual and request that customer and all opera-
tors read it before operating equipment. Point out the manual safety
rules, explain their meanings and emphasize the increased safety haz-
ards that exist when safety rules are not followed.
___
Explain to customer the potential crushing hazards of going under-
neath raised equipment. Instruct that before going underneath to dis-
connect the driveline, securely block up all corners with jack stands
and to follow all instructions in the BLOCKING METHOD, page 15 of
the operator’s manual. Explain that blocking up prevents equipment
dropping from hydraulic leak down, hydraulic system failures or
mechanical component failures.
___
Point out all guards and shields. Explain their importance and the
safety hazards that exist when not kept in place and in good condition.
___
Explain to customer that when towing on a public road to comply with
all state and local lighting/marking laws and to use a safety tow chain.
Summary of Contents for BATWING BW20.50QE
Page 1: ...OPERATOR S MANUAL BATWING ROTARY CUTTER Rev 22 10 2019 BW20 50QE BW20 60QE BW20 70QE MAN1279...
Page 10: ...10 Declaration of Conformity MAN1279 15 04 2019...
Page 45: ...Common Components 45 MAN1279 15 04 2019 NOTES...
Page 46: ...46 50 Series Parts MAN1279 15 04 2019 CENTER FRAME ASSEMBLY BW20 50QE...
Page 50: ...50 50 Series Parts MAN1279 15 04 2019 WING CENTER GEARBOX ASSEMBLY BW20 50QE...
Page 55: ...50 Series Parts 55 MAN1279 15 04 2019 NOTES...
Page 56: ...56 60 Series Parts MAN1279 15 04 2019 CENTER FRAME ASSEMBLY BW20 60QE...
Page 60: ...60 60 Series Parts MAN1279 15 04 2019 WING CENTER GEARBOX ASSEMBLY BW20 60QE...
Page 66: ...66 70 Series Parts MAN1279 15 04 2019 CENTER FRAME ASSEMBLY BW20 70QE...
Page 70: ...70 70 Series Parts MAN1279 15 04 2019 WING CENTER GEARBOX ASSEMBLY BW20 70QE...
Page 90: ...10 Declaration of Conformity MAN1279 15 04 2019 10 D claration de conformit MAN1279 15 04 2019...