Setup & Operation
Up/Down Operation
Setup & Operation
15doc121912
3-15
3
of the log.
3.7
Up/Down Operation
1.
Install a blade, if needed, and check for correct blade tension.
(
Set the cutting head to the desired height. (The blade height scale shows the height of the blade above the
bed rails.)
FIG. 3-9
150119C
Level log so
heart is same
distance from
bed rails at
both ends
Leveling
Wedge