Shadow VI User Manual
1107200
Installation and Checkout
Chapter 2
page 15
Chapter 2 – Installation and Checkout
DANGER
!
IMPROPER INSTALLATION, USE OR MAINTENANCE
•
Follow all procedures in this manual. This is required for proper operation of the light
curtain.
•
Ensure that the light curtain is installed so it is impossible for anyone to reach over, under, or
around the light curtain and into the hazardous area of the machine without being detected.
Use the correct height light curtain, combined with ancillary physical guards.
•
Install and maintain your machine guarding system according to OSHA standard 1910.212
and any other regulations and standards that apply.
•
Wire and install Shadow safety light curtains in accordance with the requirements of OSHA
lockout/tagout regulation 1910.147.
•
Ensure that Shadow safety light curtains are installed, tested and repaired by qualified
personnel.
•
Perform only the tests and repairs listed in this manual.
•
Test the operation of your Shadow safety light curtains daily using the checkout sequence
shown on the Shadow safety light curtain units and also listed in this manual. If your Shadow
safety light curtains are installed so the warning and test procedure labels are not clearly
visible, call the factory for extra warning labels to attach to your machinery in a highly visible
area.
•
Perform the checkout sequence after any maintenance is done on the Shadow safety light
curtains.
•
Ensure that supervisors, die-setters, maintenance persons, machine operators, foremen, or
any others responsible for the proper operation of the machinery have read and understood
all instructions for use of the Shadow safety light curtains.
Failure to comply with these instructions will result in death or serious injury.
Installing Shadow is a straightforward procedure. You must proceed carefully, however,
since the Shadow VI light curtain is a safety device which protects press operators and other
personnel.
Check that you received everything. With Shadow, you should have received optic heads
(transmitter and receiver), a control (the "third box"), and two interchangeable quick connect
cables, one for each optic head (required cable lengths specified at time of order). If you are
missing any of these, contact Wintriss Tech Support immediately before proceeding with the
installation. Before you start the installation, read the instructions thoroughly. Then proceed
carefully to be ensure proper installation and operation.
A brief general overview of the installation procedure is listed first in this chapter. After
reading the overview, follow the more detailed installation instructions that come next.
The
actual instructions must be followed for proper installation of Shadow VI.
Summary of Contents for Shadow VI
Page 142: ...1107200 Shadow VI User Manual page 130 Appendix C Installation of Shadow VI WPC Control Board ...
Page 144: ...1107200 Shadow VI User Manual page 132 Appendix D Replacement Parts ...
Page 150: ......
Page 151: ......
Page 152: ......
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ......
Page 158: ......
Page 159: ......