![WinGD X72-B Operation Manual Download Page 316](http://html1.mh-extra.com/html/wingd/x72-b/x72-b_operation-manual_986578316.webp)
8.4
Start the engine
Periodicity
Description
Engine start
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
0.5 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Intermediate
1
Support equipment
Description
Part No.
CSN
QTY
None
Supplies
Description
QTY
None
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
•
None
PRELIMINARY OPERATIONS
•
Refer to section
8.3 Start the engine - general
X72-B
AA00-0000-00AAA-131A-A
Operation Manual
Start the engine
Winterthur Gas & Diesel Ltd.
- 316 -
Issue 003 2021-12