6.5
Manual Control Panel (MCP) - Option for WiCE
6.5.1
Operate the manual control panel (MCP)
Periodicity
Description
Unscheduled
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
0.5 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Intermediate
1
Support equipment
Description
Part No.
CSN
QTY
None
Supplies
Description
QTY
None
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
•
None
PRELIMINARY OPERATIONS
•
The engine control system must be set to on.
X72-B
AA00-4618-00AAC-131A-A
Operation Manual
Operate the manual control panel (MCP)
Winterthur Gas & Diesel Ltd.
- 242 -
Issue 003 2021-12