37
2.
For the Installer
– Press 2 magnetic catches top/bottom into the side panel so that they align with the door catch side – Fig. 68.
– Install 2 magnet retainers top/bottom in the cladding door using 2 self-tapping screws for each – Fig. 68.
Note!
The cladding door and the boiler doors are designed for door catches on either the left or right.
Standard delivery always includes door catches on the left. The catches on the cladding door and
boiler doors must be on the same side.
Fig. 66 Lower cladding door on door hinge
Fig. 67 Upper cladding door with door hinge
2.4.22 Wood gasification boiler: cladding door installation
Fig. 68 Screw the hinge into the cladding door with 2 self-tapping screws on each
side, press 2 magnetic catches into place
2 each of
Hook in the cladding door at the upper and lower door hinges (Fig. 66) and fasten the upper door hinge with
2 washers and M6x10 hexagon screws – Fig. 67.
2 each of
1 x
M6x10
Summary of Contents for DuoWIN
Page 15: ...15 2 For the Installer ...
Page 69: ...69 5 Technical Data ...