52
2.
For the Installer
2.4.36 Pellet boiler: Laying the LON cable
The LON cable is the cable connecting the two boilers. It goes from the LON connection board of the pellet boiler
to the control panel of the wood gasification boiler.
– Lay the LON cable from the LON connection board of the pellet boiler along the cable duct and through the
opening in the side panel to the control panel of the wood gasification boiler. If there is no opening, a hole has
to be drilled with a Ø 16 mm in accordance with the sketch.
– Push the grommet (on LON cable) into the opening in the side panel of the wood gasification boiler.
– Connect the LON plug to the control panel of the wood gasification boiler.
Fig. 124 Laying the LON cable
LON cable grommet
Orange Brown Red
Cable duct
LON cable
Wood gasification boiler control panel
LON connection board for pellet boiler
140 mm
90 mm
Ø 16 mm
Drill hole for grommet if no opening is availabl
e!
LON plug
12 V
Summary of Contents for DuoWIN
Page 15: ...15 2 For the Installer ...
Page 69: ...69 5 Technical Data ...