INTRODUCTION

PRODUCT DESCRIPTION

The Package Standby System is designed to automatically 

provide standby power to unattended loads during 

electrical outages. Upon interruption of normal electrical 

service, the Packaged Standby System electrical control 

circuits will automatically start the engine. The generator 

will produce electrical power and the Automatic Transfer 

Switch (ATS) will automatically transfer the electrical loads 

to the engine-generator set. Upon restoration of normal 

electrical service the emergency transfer switch will sense 

return of the normal commercial power. The Automatic 

Transfer Switch will transfer the load back to the normal 

commercial power source. The engine control circuits will 

begin a cool-down cycle, after which the fuel supply will be 

shut off and the engine ignition system disabled.

These packaged standby systems consist of two major 

components:

1. AUTOMATIC TRANSFER SWITCH

A wall mounted ASCO 300 Automatic Transfer Switch 

(ATS) designed for inside or outside installation. The 

transfer switch is UL1008 approved. A fourteen day 

electronic exerciser circuit is installed in the ATS as standard 

equipment. The ATS also contains the power failure sensing 

circuitry necessary to start and stop the engine generator 

set. The transfer switch is also equipped standard with a 3 

second start delay, and a 15 second transfer delay to allow 

the engine to warm up before transferring the load to the 

generator. When the line power is restored the ATS has 

a 5 minute transfer delay to allow the incoming utility to 

stabilize before transferring back to line power and then 

an additional 1 minute engine cool down delay before the 

engine shuts down. Read and understand the ATS owners 

manual before installing, servicing or operating the transfer 

switch.

  

 

 

 

 

 

 

 

       

   MINIMUM

UNIT    VOLTAGE 

  

ATS 

AMPERAGE

PSS150-3    

120/240 

 

    

 

600

PSS150-4    

 

 120/208    

 

 

  500

PSS150-17    

 

 120/240    

 

 

  500

PSS150-18    

 

 277/480    

 

 

  225

2. ENGINE / GENERATOR

The engine generator set consists of a PSI 8.8L, Industrial, 

V8, liquid cooled engine equipped to run on LP/NG fuel. 

The engine operates at 1800 rpm and frequency regulation 

is maintained by the electronic governor within .5 cycles 

variation, from no load to rated load. The generator is 

a single bearing, direct drive, rotating field design. The 

generator is connected to the engine flywheel via flexible 

drive disks. The engine generator is available mounted 

in a weather proof enclosure for outside installation. 

Connection boxes are provided to all customer connections 

(both AC output and DC control). A customer supplied 

12 Volt, 900 CCA (BCI group 31) battery is required to 

complete the installation. Engine operation is controlled 

by a Deep Sea (DSE) MKII engine mounted in the engine 

generator enclosure.

NOTICE:

These units will automatically transfer if a power outage 

occurs while running in an exercise mode.

Summary of Contents for PSS150-17

Page 1: ...contact us on this unit it will help us to respond to your needs faster MODEL __________________________________________________ SERIAL NUMBER _________________________________________ PURCHASE DATE...

Page 2: ...contains important instructions that should be followed during installation and maintenance of the generator Read and understand all instructions in the manual before starting and operating the gener...

Page 3: ...mixed with fresh air A Operate only in well ventilated areas B Never operate indoors including attached garages C Never operate the unit in such a way as to allow exhaust gases to seep back into close...

Page 4: ...em 12 Volt Muffler Standard Fuel Consumption full load LP NG 19 83 GAL HR 1 832 410 BTU HR 2 014 FT HR 2 014 300 BTU HR CAUTION EQUIPMENT DAMAGE The adjustable breaker has an Instant Trip that must be...

Page 5: ...a 3 second start delay and a 15 second transfer delay to allow the engine to warm up before transferring the load to the generator When the line power is restored the ATS has a 5 minute transfer dela...

Page 6: ...laim If you sign for the unit the transfer of the ownership requires that you file the freight claim 2 Before proceeding with the preparations of your new generator for operation take a couple of minu...

Page 7: ...ovided be interpreted to conflict with any local state or national codes If in doubt always consult your local fire marshal gas supplier or building inspector WARNING FIRE HAZARD All fuel runs should...

Page 8: ...voir If this is not done the demand regulator on the unit and the pressure regulator in the fuel line will interfere with each other This regulator must be sized to accommodate the demand of the gener...

Page 9: ...mall rocker switch has been provide on the underside of the engine control cabinet for this purpose Opening the rocker switch will tell the ECU mounted on the engine that you are operating on NG Fuel...

Page 10: ...to the skin and eyes It is electrically conductive and corrosive The following precautions must always be taken 1 Always wear full eye protection and protective clothing 2 Where electrolyte contacts...

Page 11: ...without over charging them During this stage the green LED is constantly lit There are optional 5 and 10 amp chargers available that may be installed on some units The block heater is thermostatically...

Page 12: ...2 37 1 2 803 5 3 9 1 7 11 50 1 25 2 1 1 2 3 03 2 2 29 5 16 250 5 0 7 51 66 75 0 7 6 817 75 3 366 1 335 7 7 66 0 7 7 7 5 1 02 3 57 7 6 5 1 217 16 35235 7 5 1 250 7 21 21 1 72 1 2 81 87 25 86 6 352 7 0...

Page 13: ...ntrance rated This will allow you to test the generator under load Should you ever have to work on the switch you will be able to disconnect the power and work on the switch cold without having the po...

Page 14: ...art relay is closed again B ESTOP ESTOP Remote Emergency Stop terminals These two terminals are shipped with a jumper installed If your application requires the installation of a Remote Emergency Stop...

Page 15: ...T UP WARNING EQUIPMENT DAMAGE Before attempting to start this unit complete your pre start checklist and ensure the generator mainline circuit breaker is in the proper position prior to starting Start...

Page 16: ...ICE If for any reason during the check out procedure the voltage and frequency are not correct depress the STOP RESET button and correct the trouble before proceeding 4 Stopping There are two ways to...

Page 17: ...to increase dampening effect 4 LINK POWER RESPONSE A B 550kW Fast B C 100 550kW Fast A C 100kW Fast B D 100kW Slow 5 UFRO Under Frequency Roll Off Clockwise decreases KNEE point 6 SWITCH Select alter...

Page 18: ...ty air cleaner filter 7 Defective fuel solenoid valve 8 Low Voltage from battery to fuel solenoid must hold 12 Volts during cranking 9 Defective fuel regulator 10 Defective starter fuel solenoid relay...

Page 19: ...r that all power has been disconnected AUTOMATIC TRANSFER SWITCH Clean and inspect the switch once a year De energize all power sources both line and engine generator set then brush and vacuum away an...

Page 20: ...C WIRING HIGH AND LOW WYE THREE PHASE L 120 208 VOLTS THREE PHASE HIGH WYE 277 480 VOLTS 24 5060 00 60708 165 REE PHASE AC WIRING H AND LOW WYE THREE PHASE LOW WYE 120 208 VOLTS SE HIGH WYE TS 3 PH HI...

Page 21: ...21 OPM 124 B THREE PHASE DELTA 120 240 VOLTS WIRING DELTA LE PHASE 40 VOLTS 4 LEAD 3 PH DELTA 120 240V 12 LEAD 1 PH 120 240V DOUBLE DELTA...

Page 22: ...22 OPM 124 B ENGINE HARNESS SCHEMATIC...

Page 23: ...1 1 77 77 1 5 7 50 1 2 6 211 725 211 725 66 86 86 86 86 86 36 1 2 8 1387 20021 6 5 1 1 6 5 1 1 1 1 1 36 32 5 6 7 66 0 5 1 6723 6 7 66 8 6 7 21 6 7 9 5 92 7 8670 17 5 267 7 9 5 1 855 17 66 7 50 1 2 803...

Page 24: ...quires replacement of engine part or component of the product that is no longer manufactured or available Additionally WINCO Inc will not be liable for any engine replacement that may require an emiss...