6
OPM-124/B
PREPARING THE UNIT
UNPACKING
CAUTION: EQUIPMENT DAMAGE
When you unpack your new generator, be sure to
remove all of the information sheets and manual from
the carton.
1. As you receive your unit, it is critical to check it for any
damage. If any damage is noted, it is always easiest to
refuse the shipment and let WINCO take care of the freight
claim. If you sign for the unit, the transfer of the ownership
requires that you file the freight claim
2. Before proceeding with the preparations of your new
generator for operation, take a couple of minutes to ensure
the unit you have received is the correct model and review
the specification pages in this manual to ensure that this
unit meets your job requirements.
CAUTION
These units are shipped with oil. Be sure to check oil
levels before operating. See engine manufacturer’s
instruction manual for recommended oil requirements
before initial starting.