14

OPM-124/B

DC CONNECTION

CAUTION

Never run the AC and DC wiring on the same conduit.

NOTE

There are various DC connectors on the engine that 

have nothing connected to them. This was done 

intentionally, the connectors are for END OF THE LINE 

TESTING and other diagnostic tests. They are not used 

during normal operations and can just be ignored.

All DC connections are completed on the terminal strip just 

below the engine control cabinet.

A - Customer Remote Start CONNECTIONS TERMINALS. The 

two remote start leads from the Automatic Transfer Switch 

are connected to the two terminals marked Remote Start 

and Remote Start. The wire in terminal labeled #1 is Battery 

Negative/Ground and the wire in the terminal labeled #23 

is your Remote Start lead. Closing these two leads together 

will signal the DSE 7310 MKII to go into an autostart mode 

and start up the engine generator.

Depending on the distance, 14 to 16 gauge stranded wire 

should be used. It is suggested that these wires be labeled 

S1 and S23. 

Note: Any relay closure can be used to start and stop this 

generator. As long as the contact stays closed the engine 

generator set will continue to run. Once the relay is opened 

the unit will shut down and remain in the standby mode 

until the remote start relay is closed again.

B - ESTOP- & ESTOP+. Remote Emergency Stop terminals. 

These two terminals are shipped with a jumper installed. 

If your application requires the installation of a Remote 

Emergency Stop switch, remove the jumper and wire your 

switch to these terminals. This unit will not start and run 

without either the jumper installed or a remote N/C switch 

installed..

C - Battery Charger Failure. Battery charger failure relay 

input from remote battery charger to DSE7310 MKII 

controller.

D

C

B

A

E

D - Remote Display Panel Interface Terminals. These 

interface terminals are pre-wired to allow for the connection 

of a remote display. This display allows for the remote 

annunciation of alarms at a location such as a nurses station 

or a control room.

E - Battery Positive and Ground ( battery negative). These 

terminals are dedicated for any accessory that will be 

installed. There is a maximum of 7 Amps combined.

DC INTERCONNECTIONS TO ATS

Two control wires are required between the ATS panel 

and the generator control terminal box. Depending on the 

distance, 14 and 16 gauge stranded wire should be used. 

These wires should be labeled S1 and S23.

WARNING:

Be sure engine generator is in the OFF position before you 

make any DC interconnections.

ASCO 300 UL SWITCH

When Normal 

Source Fails

Terminals On 

Transfer Switch

Contact Closes

TB1 and TB2

Contact Opens

TB1 and TB3

Engine start and auxiliary circuit terminal block TB located 

on 3ATS &3NTS transfer switch.

Summary of Contents for PSS150-17

Page 1: ...contact us on this unit it will help us to respond to your needs faster MODEL __________________________________________________ SERIAL NUMBER _________________________________________ PURCHASE DATE...

Page 2: ...contains important instructions that should be followed during installation and maintenance of the generator Read and understand all instructions in the manual before starting and operating the gener...

Page 3: ...mixed with fresh air A Operate only in well ventilated areas B Never operate indoors including attached garages C Never operate the unit in such a way as to allow exhaust gases to seep back into close...

Page 4: ...em 12 Volt Muffler Standard Fuel Consumption full load LP NG 19 83 GAL HR 1 832 410 BTU HR 2 014 FT HR 2 014 300 BTU HR CAUTION EQUIPMENT DAMAGE The adjustable breaker has an Instant Trip that must be...

Page 5: ...a 3 second start delay and a 15 second transfer delay to allow the engine to warm up before transferring the load to the generator When the line power is restored the ATS has a 5 minute transfer dela...

Page 6: ...laim If you sign for the unit the transfer of the ownership requires that you file the freight claim 2 Before proceeding with the preparations of your new generator for operation take a couple of minu...

Page 7: ...ovided be interpreted to conflict with any local state or national codes If in doubt always consult your local fire marshal gas supplier or building inspector WARNING FIRE HAZARD All fuel runs should...

Page 8: ...voir If this is not done the demand regulator on the unit and the pressure regulator in the fuel line will interfere with each other This regulator must be sized to accommodate the demand of the gener...

Page 9: ...mall rocker switch has been provide on the underside of the engine control cabinet for this purpose Opening the rocker switch will tell the ECU mounted on the engine that you are operating on NG Fuel...

Page 10: ...to the skin and eyes It is electrically conductive and corrosive The following precautions must always be taken 1 Always wear full eye protection and protective clothing 2 Where electrolyte contacts...

Page 11: ...without over charging them During this stage the green LED is constantly lit There are optional 5 and 10 amp chargers available that may be installed on some units The block heater is thermostatically...

Page 12: ...2 37 1 2 803 5 3 9 1 7 11 50 1 25 2 1 1 2 3 03 2 2 29 5 16 250 5 0 7 51 66 75 0 7 6 817 75 3 366 1 335 7 7 66 0 7 7 7 5 1 02 3 57 7 6 5 1 217 16 35235 7 5 1 250 7 21 21 1 72 1 2 81 87 25 86 6 352 7 0...

Page 13: ...ntrance rated This will allow you to test the generator under load Should you ever have to work on the switch you will be able to disconnect the power and work on the switch cold without having the po...

Page 14: ...art relay is closed again B ESTOP ESTOP Remote Emergency Stop terminals These two terminals are shipped with a jumper installed If your application requires the installation of a Remote Emergency Stop...

Page 15: ...T UP WARNING EQUIPMENT DAMAGE Before attempting to start this unit complete your pre start checklist and ensure the generator mainline circuit breaker is in the proper position prior to starting Start...

Page 16: ...ICE If for any reason during the check out procedure the voltage and frequency are not correct depress the STOP RESET button and correct the trouble before proceeding 4 Stopping There are two ways to...

Page 17: ...to increase dampening effect 4 LINK POWER RESPONSE A B 550kW Fast B C 100 550kW Fast A C 100kW Fast B D 100kW Slow 5 UFRO Under Frequency Roll Off Clockwise decreases KNEE point 6 SWITCH Select alter...

Page 18: ...ty air cleaner filter 7 Defective fuel solenoid valve 8 Low Voltage from battery to fuel solenoid must hold 12 Volts during cranking 9 Defective fuel regulator 10 Defective starter fuel solenoid relay...

Page 19: ...r that all power has been disconnected AUTOMATIC TRANSFER SWITCH Clean and inspect the switch once a year De energize all power sources both line and engine generator set then brush and vacuum away an...

Page 20: ...C WIRING HIGH AND LOW WYE THREE PHASE L 120 208 VOLTS THREE PHASE HIGH WYE 277 480 VOLTS 24 5060 00 60708 165 REE PHASE AC WIRING H AND LOW WYE THREE PHASE LOW WYE 120 208 VOLTS SE HIGH WYE TS 3 PH HI...

Page 21: ...21 OPM 124 B THREE PHASE DELTA 120 240 VOLTS WIRING DELTA LE PHASE 40 VOLTS 4 LEAD 3 PH DELTA 120 240V 12 LEAD 1 PH 120 240V DOUBLE DELTA...

Page 22: ...22 OPM 124 B ENGINE HARNESS SCHEMATIC...

Page 23: ...1 1 77 77 1 5 7 50 1 2 6 211 725 211 725 66 86 86 86 86 86 36 1 2 8 1387 20021 6 5 1 1 6 5 1 1 1 1 1 36 32 5 6 7 66 0 5 1 6723 6 7 66 8 6 7 21 6 7 9 5 92 7 8670 17 5 267 7 9 5 1 855 17 66 7 50 1 2 803...

Page 24: ...quires replacement of engine part or component of the product that is no longer manufactured or available Additionally WINCO Inc will not be liable for any engine replacement that may require an emiss...

Reviews: