The product is delivered by the manufacturer/shipping agency 
in suitable packaging. This normally precludes the possibility of 
damage occurring during transport and storage. The packaging 
should be stored in a safe place if the location used is changed 
frequently.

4.3 Storage

Newly supplied products are prepared that they can be stored 
for at least 1 year. The product should be cleaned thoroughly 
before interim storage.
The following should be taken into consideration for storage:

- Place the product on a firm surface and secure it against 

falling over. Submersible motor pumps should be stored 
vertically. 

Danger from falling over
Never put down the product unsecured. If the 
product falls over,
injury can occur.

- Our products can be stored at temperatures down to -15 °C. The 

store room must be dry. We recommend a frost-protected 
room with a temperature of between 5˚C and 25˚C for 
storage.

- The product may not be stored in rooms where welding 

work is conducted as the resulting gases and radiation can 
damage the elastomer parts and coatings.

- Any suction or pressure connections on products should be 

closed tightly before storage to prevent impurities. 

- The power supply cables should be protected against 

kinking, damage and moisture.

Beware of electrical current
Damaged power supply cables can cause fatal injury! 
Defective cables must be replaced by a qualified 
electrician immediately.

- The machine must be protected from direct sunlight, heat, dust, 

and frost. Heat and frost can cause considerable damage to 
propellers, rotors and coatings.

- The rotors or propellers must be turned at regular intervals. 

This prevents the bearing from locking and the film of 
lubricant on the mechanical shaft seal is renewed. This also 
prevents the gear pinions (if present on the product) from 
becoming fixed as they turn and also renews the lubricating 
film on the gear pinions (preventing rust film deposits).

Beware of sharp edges
Sharp edges can form on rotors and propellers. There 
is a risk of injuries. Wear protective gloves.

- If the product has been stored for a long period of time it 

should be cleaned of impurities such as dust and oil deposits 
before start-up. Rotors and propellers should be checked 
for smooth running, housing coating and damage.

Before start-up, the filling levels (oil, motor filling etc.) of 
the individual products should be checked and topped up if 
required. Products filled with white oil should be completely 

filled before start-up. Please refer to the machine data sheet 
for specifications on filling.

Damaged coatings should be repaired immediately. 
Only a coating that is completely intact fulfills the 
criteria for intended usage.

If these rules are observed, your product can be stored for 
a longer period. Please remember that elastomer parts and 
coatings become brittle naturally. If the product is to be stored 
for longer than 6 months, we recommend checking these 
parts and replacing them as necessary. Please consult the 
manufacturer.

4.4 Returning to the supplier 

Products which are delivered to the plant must be clean 
and correctly packaged. In this context, clean means that 
impurities have been removed and decontaminated if it has 
been used with materials which are hazardous to health. The 
packaging must protect the product against damage. If you 
should have any questions please contact the manufacturer.

5 Installation

In order to prevent damage to the machine or serious injury 
during installation the following points must be observed:

- Installation work – assembly and installation of the machine 

– may only be carried out by qualified persons. The safety 
instructions must be followed at all times.

- The machine must be inspected for transport damage before 

any installation work is carried out .

5.1 General information

After pumping water containing lime, clay or cement, flush out 
the machine with clean water in order to prevent encrustation 
and to prevent later break-downs.
If you are using level control, make sure that the minimum 
water coverage is present. Air pockets may not be allowed to 
enter the pump housing or the pipeline system, and they must 
be removed with a suitable ventilation system and/or a small 
inclination of the machine (with a portable installation). Pro-
tect the machine from frost.

5.2 Installation types

Possible types of vertical installation for the machine: 
- Wet installation with a suspension unit.
- Portable wet installation. 

5.3 The operating area

The operating area must be laid out for each machine. You 
must ensure that lifting gear can be fitted without any trouble, 
since this is required for assembly and removal of the machine. 
It must be possible to safely reach the machine in its operating 
and storage locations using the hoisting gear.

The machine must be located on a firm foundation.
Electric power cables must be laid out in such a way that safe 
operation and non-problematic assembly/dismantling are 
possible at all times.
The structural components and foundations must be of 
sufficient stability to ensure safe and functional operation. 
The operator or the supplier is responsible for the provision 
of the foundations and their accuracy in terms of dimensions, 
stability and strength.
Never let the machine run dry. Therefore, we recommend 
installing a level control unit or a dry-run protection system 
where there are great variations in the level.
Use guide and defector plates for the pumped fluid intake. If 
the water jet reaches the surface of the water or the machine, 
air will be introduced into the pumped liquid. This will lead to 
unfavorable current and pumping conditions. As a result, the 
machine does not run smoothly and is subjected to higher 
wear and tear.

5.4 Assembly accessories

Swiveling hoisting gear
The maximum bearing capacity must be greater than the 
weight of the machine, add-on units and cable. It is essential 
that the machine can be lifted and lowered without hindrance 
or endangering personnel. There should be no objects or 
obstacles in the swiveling range of the hoisting gear.
Suspension unit (according to the mounting type)
The suspension unit connects to the discharge pipe.
Pump base (according to the mounting type)
The portable pump need a pump base. The pump base is 
installed on a firm foundation to keep pump safe. 
Fixing materials and tools
Make sure you have the required tools (such as wrenches) and 
other material (such as plugs and anchor bolts). The fastening 
materials should be sufficiently stable to ensure safe assembly.

5.5 Installation

The following information should be taken into consideration 
when installing the machine: 

- This work may only be carried out by qualified personnel. 

Electrical work may only be carried out by qualified electricians.

- Lift the machine by the handle or lifting eyelets, never by 

the power supply cable. When assembling with chains, they 
must be connected with a shackle to the lifting eyelets or 
the carrying handle. Fastening devices must have official 
approval.

- Please observe all guidelines, rules and legal requirements 

for working with and underneath heavy suspended loads.

- Wear the appropriate protective clothing/equipment.
- If there is danger that poisonous or asphyxiating gases may 

collect, then the necessary counter-measures should be 
taken.

- Please also observe all accident prevention guidelines, trade 

association safety guidelines and the advice contained in 
this operating and maintenance manual.

- The coating of the machine is to be examined before 

installation. If defects are found, these must be eliminated. 
An intact coating is necessary for the best possible protection 
from corrosion.

Wet installation with a suspension unit

A suspension unit must be installed for wet installation. This 
must be ordered separately from the manufacturer. The 
pipeline system on the discharge side is connected to this. 
The connected pipeline must be self-supporting, i.e. it should 
not be supported by the suspension unit. The operating area 
must be laid out so that the suspension unit can be installed 
and operated without difficulty. For maintenance and/or repair 
work, the machine must be taken out of the operating area. 
The suspension unit makes this possible at any time.
The machine must be completely submerged in pumped 
liquid up to the minimum water coverage.

- Install the suspension unit in the operating area (Only use a 

suspension unit produced by the manufacturer. Information 
about installation is located in the appendix of this 
operating manual.).

- Prepare the machine for operation on a suspension unit.
- Check that the suspension unit is firmly fixed and functions 

properly.

- Have an expert connect the machine to the power supply 

and check the direction of rotation in accordance with 
chapter 6.

- Lower the machine slowly onto the guide pipes in the 

operating area. Hold the electric power cables slightly taut 
when lowering. When the machine is connected to the 
suspension unit, make sure that the electric power cables 
are secured adequately against falling and/or damage.

- For new installation: Flood the operating area and bleed the 

discharge pipe.

- Start the machine in accordance with chapter 6.

 

5-1: Example of wet installation

Summary of Contents for Wilo-FAG

Page 1: ...Wilo FAG Pioneering for You en Installation and operating instructions...

Page 2: ...2 13 8 2 14 8 2 15 8 3 8 3 1 8 3 2 8 3 3 8 3 4 8 3 5 10 3 6 10 3 7 10 3 8 10 4 11 4 1 11 4 2 11 4 3 11 4 4 11 5 11 5 1 11 5 2 11 5 3 12 5 4 12 5 5 12 5 6 13 5 7 13 5 8 13 6 13 6 1 13 6 2 13 6 3 13 6 4...

Page 3: ...5 1 1 1 18 1 2 1 3 Wilo China Ltd 10 101300 010 52347888 010 52347666 E mail wilo info wilo com cn Http www wilo com cn 1 4 2 2 1 2 2 2 3 2 4 2 5 2 6 2 7 2 8 2 9 GB EU 2 10 IP68 2 11 PTC 2 12 70 110 8...

Page 4: ...6 7 2 13 12 18 2 14 2 15 S1 S2 S2 15 15 2K S1 S2 15 3 3 1 3 2 3 3 30 10 10 1 2 30kW 1050kg m3 1 106 m2 s PH 6 9 40 25 400mm 3 4 F B IP68 30kW 3 1 4kW 4kW 1 2 3 4 5 6 7 8 9 10 11 12 13...

Page 5: ...2 3 4 5 6 7 8 9 10 11 12 13 14 30kW 1 2 3 4 5 6 7 8 9 10 11 12 13 14 3 2 5 5 22kW 3 5 FAG 100 C 25 100 75 Cutter FA G 100 mm C C Z Cutter 25 m 100 m3 h 75 kW 10 3 6 40 3 7 3 8 4 4 1 4 2 4 3 1 15 5 25...

Page 6: ...10 11 5 3 40 5 4 5 5 S2 6 5 1 40 5 6 5 7 5 8 6 S1 6 1 7 6 2 6 3 30...

Page 7: ...58 3 5 70 3 4KW 5 5kW PTC 5 5kW 30kW 5 5 kW 22kW K1 K2 K3 PTC K1 K2 K3 30kW PTC K1 K2 K3 K4 K7 K1 K2 K3 K4 K7 30kW K5 K6 22kW FAG Y 6 5 5 2 5 1 5 7 9 0 7 1 2 1 3 10 3 5 1 7 50 10 7 1 O 7 2 7 3 7 4 50...

Page 8: ...14 15 K3 200K K3 100K K3 K4 200K 0 K4 5K K5 K6 K7 K4 K3 200K 100 200K 100K 35 45 50 0 5 1 7 5 8 8 1 5 8 2 40 8 3 7 5 6 9 2 9 1 1 9 1 2 9 2 3 9 3 4 9 4...

Page 9: ...4 Constrution 24 3 5 Type designation 25 3 6 Cooling 25 3 7 Technical data 25 3 8 Special explanation 25 4 Transport and storage 25 4 1 Delivery 25 4 2 Transport 25 4 3 Storage 26 4 4 Returning to the...

Page 10: ...that they can be found quickly Sufficient ventilation must be provided in enclosed rooms When welding or working with electronic devices ensure that there is no danger of explosion Only use fastening...

Page 11: ...onnel The maintenance and inspection log supplied must be properly updated This enables you to monitor the status of inspections and maintenance work Quick repairs not listed in this operation and mai...

Page 12: ...ber electrode depending on the model Depending on the connection a warning signal can be displayed and or the machine switched off if water enters the motor chamber terminal chamber or the sealing hou...

Page 13: ...be laid out for each machine You must ensure that lifting gear can be fitted without any trouble since this is required for assembly and removal of the machine It must be possible to safely reach the...

Page 14: ...7 6 2 Electrical system Observe the relevant local and national regulations when laying out and selecting the electric lines as well as when connecting the motor The motor must be protected by a motor...

Page 15: ...ine parts made by the manufacturer A trial run or functional test of the machine must be performed as instructed in the general operating conditions 7 1 General overhaul During this the bearings shaft...

Page 16: ...t the machine if it is in perfect condition and ready for operation 9 Troubleshooting In order to prevent damage or serious injury while rectifying machine faults the following points must be observed...

Page 17: ...ith mechanical strain Check the installation use rubber spacers if necessary Fault6 Mechanical shaft seal leaks sealing chamber monitor reports fault and switches the machine off Cause Remedy Condensa...

Page 18: ...ou Wilo China Ltd No 10 Zhaofeng 2nd Street Zhaofeng Industrial Zone Airport Industrial Zone C Zhaoquanying Shunyi District 101300 Beijing China T 86 10 52347888 F 86 10 52347666 wilo info wilo com cn...

Reviews: