Fig. 3A
11
cylinder is turned off at the cylinder and the pressure in the
tubing on the low pressure side has been released.
For the regulators supplied by WilliamsWarn to release pressure on
the low pressure side, wind the regulator knob out anti-clockiwse
to its closed position and the low pressure gas will release itself.
Other than installing the components required to make the
brewery functional it is not envisaged that the user will be
required to access this area and you should not attempt to make
any alterations, modifications or repairs to the machine without
the strict guidance of the supplier/manufacturer.
All warranties will be void if the above process is not followed.
INSTALL THE DRAFT BEER TAP FONT
Install the draft beer tap font as follows:
1. Take the draft beer tap font as shown in Figure 3A.
2. At the base of the font are two John Guest fittings and three
M8 bolts, the fittings have been installed and tested with
the unit prior to removal for transport, please do not loosen
or adjust them as it could affect the performance of your
brewery. The three M8 x 25mm bolts can be removed from
the base ready for reinstallation. See Figure 3B.
3. Remove the rear protective panel from the unit by turning
the latches with a screwdriver and remove, see Figure 3C.
IMPORTANT: Please ensure that the brewery has not been
connected to the mains before removal of the protective
panel, if it has please turn off and unplug before proceeding.
4. Once the panel has been removed, locate the draft beer
font over the holes provided in the top of the beer tower and
install the three M8 x 25mm bolts back into the base of the
font firmly. See Figure 3D.
5. You are now ready to install the beer line and the CO
2
lines
into the beer font. There are two available lines inside the
beer tower. One has an insulated sleeve over it and the other
is a black ¼" tube. The one that has an insulated sleeve is
the beer line and the black tube is the CO
2
line.
6. To install the beer line, slide the insulation back to expose
the end of the tube and press it firmly into the centre fitting
on the underside of the beer font, see Figure 3E. There is a
blue line on the tube; push the tube so that the blue line is
almost hidden by the fitting. This is the end point. Check to
make sure that it is installed properly by pulling it gently to
make sure it is locked in. The beer line is now installed.
7. To install the CO
2
line push the black tube firmly into the other
available fitting at the rear of the font, and check by pulling it
gently to make sure that it is locked in. See Figure 3F.
8. Leave the back protective cover off for the next step of
filling the glycol tank for the heating cooling system.
INSTALL THE GLYCOL INTO THE HEATING COOLING UNIT
Install the glycol into the heating cooling tank as follows:
1. Remove the large rubber bung in Figure 3G with a
screwdriver or similar so that you can access the slot in the
foam insulation above the glycol tank.
2. Insert the funnel supplied through the slot in the insulation
so that you can pour liquid down the funnel. Figure 3H.
Fig. 3B
Fig. 3D
Fig. 3C
Fig. 3E
Fig. 3F