www.willburt.com
1
Base T
ube
Mast T
ube
Top T
ube
TOP
BOTTOM
2
2
3
4
4
To Ensure Safe Installation:
1.
For the base of the deployed tripod, select a site that
has no more than a 5
°
slope. Ensure that the center of the
site is approximately .5m / 2 ft. square and is level and
smooth. The center of the site is where the base tube for
the mast will land later in the installation.
2.
Ensure that the site has adequate overhead and ground
clearances. The overhead clearance must be at least
the height of the mast. The ground clearance must be a
radius equal to the height of the mast. For example, for a
4m / 13.1 ft. mast, ensure that the site has an overhead
clearance of 4m / 13.1 ft. and a clear radius of 4m / 13.1
ft. from the center of the site.
3.
Unzip the wheeled bag, remove guy bag and short bag.
4.
Remove the tripod. Remove the top tube and base tube
making sure to keep separate from mast tubes.
Do not duplicate, alter, or copy without the written consent of The Will-Burt Company. © Copyright 2013 The Will-Burt Company
20