All information, illustrations and technical specifications in these operating instructions are based on the latest information available at the time of
publication. We reserve the right to make design changes at any time without prior notification.
77
8.0 Maintenance
8.2. Maintenance and inspection list
8.2.1.
Basic unit
Working
hours
Check
Procedure
40
Receptacles of the two outer
oscillating units
Lubricating
100
Check the clearance of the central
universal joint (left-hand side)
If clearance >2 mm, the plain
bearing bushings must be replaced
Check the clearance of the plain
bearings (right-hand side)
If clearance >2 mm, the plain
bearing bushings must be replaced