All information, illustrations and specifications in these Operating Instructions are based on the latest information available at the time of
publication. We reserve the right to make design changes at any time without prior notification
16
2.0. Assembly
2.1. General Information
For this work, please use your
personal protective equipment
(PSA) such as: gloves, goggles,
ear protectors.
2.2. Installing the fill level display
Secure the position switch (A)
with the flexible arm in the
container at the existing
bores, using two cylinder
screws (B).
Drill a borehole D=11 mm in the
container in upward direction.
Attach rubber bushings (C) to
protect the cables.
Boreholes (G) for connecting
with the terminal box (F) and
buzzer (D).
Attach junction box (F) to the
existing bores.
Attach the buzzer (D) to the
front with two screws (E).
Lay connecting cable (with
plug) along the hydraulic pipes
through the recess and to the
junction box.
Lay all cables to the
junction box (F).
The cabling is in accordance
with the enclosed connecting
diagram 103 85 52.