![Whitmore OilSafe Advanced Bulk System Owner'S Manual Download Page 12](http://html1.mh-extra.com/html/whitmore/oilsafe-advanced-bulk-system/oilsafe-advanced-bulk-system_owners-manual_977314012.webp)
10
5. INSTALLATION
STEP 4.
Using a level and the provided jacking bolts in the base frame, adjust the Pod until it is level from front to back, side to side, and top to bottom.
Check to ensure it is square to any adjacent rear or side walls.
STEP 5.
Locate Pod-2 and remove and appropriately dispose of the freight packaging.
STEP 6.
Using a suitable hand pallet truck, position Pod-2 to the right of Pod-1 so that the spill transport pallets are square and flush next to one another.
See Figure 5 and Figure 6.
STEP 7.
Using a level and the provided jacking bolts in the base frame, adjust the Pod until it is level from front to back, side to side, and top to bottom,
and square with the adjacent Pod.
CAUTION!
ALWAYS keep hands and feet clear of mating and moving parts when moving the Pods into position.
FIGURE 5:
Pod-2 Placement
FIGURE 6:
Final Pod Positioning
Summary of Contents for OilSafe Advanced Bulk System
Page 2: ......
Page 40: ...Advanced Bulk System 37 NOTES ...
Page 41: ...38 NOTES ...
Page 42: ......