4-11
REMOVING THE BELT, DRUM, & ROLLERS
NOTE:
Sharp edges may be present.
8.
Loosen the two top front panel screws.
1.
Turn off the gas to the dryer and discon-
nect the electrical power.
2.
Pull the dryer away from the wall and
remove the top cover (see steps 3 and 4
on page 4-2 for the procedure).
3.
Remove the console (see page 4-4 for the
procedure).
4.
Remove the lint duct (see steps 2 through
5 on page 4-7 for the procedure).
5.
Reach around behind the drive motor and
push the idler wheel arm to the left, then
remove the tension, and remove the belt
from the idler pulley.
9.
Remove the two bottom front panel screws.
Push To Left
Remove Belt
From Idler Pulley
6.
Disconnect the 3-wire moisture sensor
connector from the main harness connec-
tor.
Top Front Panel Screws
Bottom Front Panel Screws
7.
Disconnect the 3-wire door switch con-
nector from the machine control electron-
ics board connector.
Moisture Sensor
Connector
3-Wire
Door Switch
Connector
Continued on the next page.
Summary of Contents for duet GEW9200L Series
Page 4: ... iv NOTES ...
Page 10: ...1 6 NOTES ...
Page 32: ...3 6 NOTES ...
Page 48: ...4 16 NOTES ...
Page 62: ...6 4 NOTES ...
Page 63: ...7 1 WIRING DIAGRAMS ELECTRIC DRYER GAS DRYER ...
Page 64: ...7 2 NOTES ...
Page 65: ...7 3 NOTES ...
Page 66: ...7 4 NOTES ...
Page 68: ...CORPORATION ...