47
13 Maintenance and servicing
13.7 Procedures after maintenance
After completing the maintenance, perform the following steps:
P
Make sure that all previously loosened screw connections are
tightened.
P
Ensure all previously removed guards and covers are properly
reinstalled.
P
Ensure all tools, materials, and other equipment used have been
removed from the work area.
P
Clean work area and remove any leaked liquids. Remove cleaning
material such as cloths, etc.
P
Make sure all safety devices are working properly.
13.8 Notes regarding maintenance work
For maintenance work and related replacement of
components, only the use of original spare parts is
permitted.
13.9 Documentary list
Incidents and interference must be recorded in a docu-
mentary list. The documentary lists must be filed elec-
tronically and/or in paper form.
NOTICE
NOTICE