![WELLSYSTEM Medical_Plus Operating Instructions Manual Download Page 126](http://html1.mh-extra.com/html/wellsystem/medical_plus/medical_plus_operating-instructions-manual_955842126.webp)
Cleaning and maintenance
54/70
4.5
Maintenance performed by the
operator
4.5.1
Daily visual inspection
–
Inspect the device for leaks.
WARNING!
The device might be damaged by moisture!
–
The device may no longer be used in the event of water
loss (puddles on the floor). Please inform our customer
service department – see page 2.
–
Do not switch the device on if there are leaks or if it is
damaged. Inform our customer service department –
see page 2.
4.5.2
Venting
The tank must be vented 3 days after commissioning or after it has been
initially filled. After this, venting is unnecessary unless leakages occur and the
tank has to be topped up.
DANGER!
Illnesses can be caused by contaminated water!
The water in the tank is untreated and can be contaminated
with bacteria.
–
Wear protective gloves if you are likely to come into
contact with the water.
–
Open the valve.
–
Press the rubber blanket down gently, so that the air escapes.
–
Shut the valve again afterwards.
Summary of Contents for Medical_Plus
Page 1: ......
Page 2: ......
Page 70: ...Anhang 68 70 7 3 1 Hinweise zum Formblatt f r die Meldung von Vorkommnissen...
Page 142: ...Index 70 70...
Page 143: ......