Service Manual
Repair Procedures
91
Replacing Expansion Module Side Panels
The side panels easily slide out after the chassis and rear panel are separated. If the
patient connector side panel is being replaced, this side panel and the two circuit boards
must be removed together before disconnecting the side panel from the circuit board.
See
“Replacing the SpO2 Circuit Boards”
on page 86 or
If the speaker side panel is being replaced, separate the chassis and rear panel as
described earlier in this section, disconnect the speaker from the SCP or MSP board, and
slide out the speaker side panel.
Summary of Contents for Propaq Encore
Page 1: ...Propaq Encore Vital Signs Monitor Service Manual...
Page 14: ...10 Overview Welch Allyn Propaq Encore Vital Signs Monitor...
Page 50: ...46 Troubleshooting Welch Allyn Propaq Encore Vital Signs Monitor...
Page 96: ...92 Repair Procedures Welch Allyn Propaq Encore Vital Signs Monitor...
Page 111: ...Service Manual Technical Overview 107 Cabling Diagrams cabling diag...
Page 120: ...116 Technical Overview Welch Allyn Propaq Encore Vital Signs Monitor...
Page 126: ...122 Field Replaceable Units FRUs Welch Allyn Propaq Encore Vital Signs Monitor...
Page 128: ...124 Manufacturable Test Equipment Welch Allyn Propaq Encore Vital Signs Monitor...