Service Manual
Repair Procedures
73
6.
Lift out the Recharger board.
When installing the Recharger board:
•
blow out any dust and particulates using pressurized de-ionized gas
•
move all cables out of the way
•
torque screws to 3.8in-lbs to 4.2in-lbs (.43N-m to .47N-m)
Caution
As you set the board in place during installation, keep the board clear
of the power switch solder terminals to avoid binding against them. The
terminals may become damaged if force is applied against them.
0696 40
Screws
Screws
Summary of Contents for Propaq Encore
Page 1: ...Propaq Encore Vital Signs Monitor Service Manual...
Page 14: ...10 Overview Welch Allyn Propaq Encore Vital Signs Monitor...
Page 50: ...46 Troubleshooting Welch Allyn Propaq Encore Vital Signs Monitor...
Page 96: ...92 Repair Procedures Welch Allyn Propaq Encore Vital Signs Monitor...
Page 111: ...Service Manual Technical Overview 107 Cabling Diagrams cabling diag...
Page 120: ...116 Technical Overview Welch Allyn Propaq Encore Vital Signs Monitor...
Page 126: ...122 Field Replaceable Units FRUs Welch Allyn Propaq Encore Vital Signs Monitor...
Page 128: ...124 Manufacturable Test Equipment Welch Allyn Propaq Encore Vital Signs Monitor...