16
CHAPTER 3
Startup Procedure
3.1.1
Installation Checklist
Table 3-1 Installation Check List
TASK
REFERENCE
COMPLETED
(Page Number)
Preparation
Check
Operating
Location
Clearances
10-11
Test Supply Water Quality
12
Verify
Electric
Power
Requirements.
3,
11,
15
Verify Exhaust Hood Requirements
6
Installation
Unit installed with optional legs or approved stand
5-6
Check
Exhaust
Hood
Function
6,
9
Check
Electrical
Supply
Connection
15
Check Water Supply Connection
11, 12-15
Verify
MINI
is
Level
5-6
Check
Drain
Line
Connection
13-15
Call for your Start-Up
2
Notes:
Water leaking from the door gasket can be a sign of a blocked drain. If the drain is blocked, hot
water can accumulate inside the compartment and spill out when the door is opened causing INJURY
and EQUIPMENT DAMAGE. When checking inside the MINI: Stand to the hinge side and away from
the MINI, and always open the door slowly.
ELECTRIC SHOCK HAZARD DEATH, INJURY, or EQUIPMENT DAMAGE can result from touching any
component inside a MINI when the power is connected to a MINI. Whenever possible disconnect the
power while installing, servicing, or testing a MINI. When installation, service, or tests require power to
be connected to a MINI; use extreme caution and every possible precaution and safety measure while
testing or servicing the MINI.
Hot air, steam, and condensate can cause DEATH, INJURY, and EQUIPMENT DAMAGE. Do NOT breathe
hot air, steam, or condensate. When checking inside the MINI: Stand to the hinge side and away from
the MINI, and always open the door slowly
.