![Weidmüller 1334950000 Manual Download Page 59](http://html1.mh-extra.com/html/weidmuller/1334950000/1334950000_manual_952268059.webp)
8 Commissioning using u-create web
WARNING
Explosion risk!
▶
Before starting any work, make sure that
there is not a potentially explosive atmos-
phere!
WARNING!
Manipulation of the control unit!
During commissioning, the system may be
manipulated to such an extent that can result
in risks to life and material damage.
▶
Make sure that system components can-
not start up unintentionally!
ATTENTION
The product can be destroyed!
▶
Before commissioning each time, perform an insulation
test of the station (see section 6.6).
▶
Observe the built-in online help in u-create.
8.1 Requirements
The following controllers can be commissioned using u-cre-
ate web:
–
UC20-WL2000-AC
–
UC20-WL2000-IOT
Before you start the commissioning work, the following re-
quirements must be fulfilled:
–
The u-control station must be completely assembled and
wired up.
–
PC or laptop and u-control station are connected via USB
or Ethernet.
–
The power supply must be turned on.
If these requirements are fulfilled, the following LEDs light
up:
–
on the controller
–
The PWR LED lights up green.
–
For the port to which the controller is connected, the
L/A LED lights up green.
–
On the modules, the Status LED lights up green.
Web browser
u-create web can be used with the following web browsers.
–
Mozilla Firefox 61 or higher
–
Google Chrome 67 or higher
Screen resolution
For u-create web we recommend a screen resolution of
1280 x 800 or higher. The user interface is displayed opti
-
mally when the browser window is maximised.
8.2 Starting u-create web
You can access u-create web via the USB interface or Ether-
net.
▶
For USB access, connect the PC to the controller using a
USB cable. The USB connection socket is located under
the service flap on the front.
The USB cable should be a maximum of 2 m
long (type USB-A to USB Micro-B, for example
Weidmüller Order No. 1487980000). Extension
cables must not be used!
▶
For Ethernet access, connect the PC to the controller
using a LAN cable or a network switch.
▶
Open one of the browsers listed in section 8.1.
▶
In the address line, enter the IP address of the controller.
–
USB access:
192.168.10.202
–
Ethernet access:
192.168.0.101
u-create web is started.
The licence terms are displayed when u-create web is
launched for the first time.
▶
Read the licence terms carefully.
▶
Confirm that you agree to the licence terms
▶
Click on
Accept license agreement
, to proceed to the
login page.
8 Commissioning using u-create web
| Requirements
59
Manual u-control
2604080000/03/08.2020
Summary of Contents for 1334950000
Page 8: ...8 2604080000 03 08 2020 Manual u control...
Page 22: ...22 2604080000 03 08 2020 Manual u control...
Page 58: ...58 2604080000 03 08 2020 Manual u control...
Page 62: ...62 2604080000 03 08 2020 Manual u control...
Page 70: ...70 2604080000 03 08 2020 Manual u control...
Page 72: ...72 2604080000 03 08 2020 Manual u control...