
WECO 5K3-XP-EMEA
78
3.6.2
DATA Connections (Example of 12-Modules)
Step 1
: Set up the DIP Switches as per the picture below.
Step 2
: Connect the CAN and Link PORTS, starting from the HV Box PORT CAN A and LINK, then chain
connection as shown below.
The HV Box must be set up before turning it on. The DIP addresses must follow the picture below to enable the
CAN communication. The last module of the series must be terminated by addressing the module as shown in the
picture to end the CAN line.
Single HV Box Battery Module End Module
Step 3:
Link all modules and the HV Box with 16 mm earthing cables (In/Out) by using the GND connections point.