WECO 5K3-XP-EMEA
18
1.2
Module Unpacking and Handling
The battery is always delivered in WALL mode, and it is therefore necessary for the installer to make simple
changes to install the STACK kit. Below are the installation phases.
ATTENTION:
The battery must be lifted by four persons, using the four handles.
Two handles are built in and the other two are provided as temporary handles to be used as shown below.
Open the carton box, find the portable and retractable handles, position them and proceed with lifting.
ATTENTION:
The support feet are designed to slide by slightly losing the holding screws, put the feet into position then tight
again the screws by using an ALLEN key to secure the feet before lifting the battery
Loose the screws
and adjust the
foot position