WECO 5K3-XP-EMEA
48
Cable size verification for a cluster composed by 5 or more Battery Modules connected to the inverter with 2 sets
of cables (50mm² each) for a total of 100 mm² each terminal (positive and negative).
When more than one battery is connected in parallel we suggest to use a capacity reduction factor of 2% to
calculate the Cluster Capacity at the first installation.
When used in Cluster the Initial Capacity is calculated in 5.2kWh per Module.
Numbers of Modules
C-Rate
Current Allowance
Power W
1
1
100
5.200
2
0.98
196
10.192
3
0.96
288
14.976
4
0.94
376
19.552
5
0.92
460
23.920
6
0.9
540
28.080
7
0.88
616
32.032
8
0.86
688
35.776
9
0.84
756
39.312
10
0.82
820
42.640
11
0.8
880
45.760
12
0.78
936
48.672
13
0.76
988
51.376
14
0.74
1036
53.872
15
0.72
1080
56.160
ATTENTION
The Battery Terminal Block can support max 50/75mm² on each connection point (two each pole).
It is compulsory to set the maximum inverter current in accordance with the output cables
capabilities.
Cable sizing need to be performed by a local electrical engineer
ATTENTION
Cable sizing must be calculated by a qualified technician/engineer, based on local regulations,
and in accordance with overall system design.