Page 8 5-1-GL-GL-SUL-00028 SLS Baseline 8900 Setup and Calibration Manual
BASELINE 8900 CHROMATOGRAPH SETUP
1)
Apply Zero Air, Hydrogen, and sample to the instrument at correct pressures
Figure 1: Baseline 8900 Support Gases
2)
Connect a null serial cable from the Baseline 8900 to the operations computer
3)
Connect a power cable to the Baseline 8900 and plug it into a UPS providing 110VAC power
4)
Flip the power switch on the back of the Baseline 8900 to the “On” position
5)
Allow the Baseline unit approximately 20 minutes to warm up. The front screen on the
instrument will indicate when the warm up time is over