![WDT Solfog V2 Operating And Installation Instructions Download Page 21](http://html1.mh-extra.com/html/wdt/solfog-v2/solfog-v2_operating-and-installation-instructions_879010021.webp)
Brine fog maker, Type Solfog V2
Index: 01
Change date: 12/12/2017
Operating instructions no.: BA DW 018-01 Solfog V2 EN.docx
Page 21 of 39
3.
Connect the new, unused
brine politainer (09)
with the 5% brine solution on the dosing conduct.
Therefore take the empty brine politainer from the
console and turn the orifice upwards.
Now you pull the
connection plug (61)
out of the
connection sleeve of the
politainer connection (62
) and
hold the empty brine politainer with the
lock
upwards
in the hand.
Screw the politainer connection off from the empty
politainer.
Take a new brine politainer 1kg or 5 kg) and hold it
with the lock upwards, and open the lock of the brine
politainer. Attention, the politainer is now open!
Then you screw the politainer connection on the
open brine politainer. Now you insert the connection
plug into the connection sleeve of the politainer
connection. Now the politainer is closed again. Turn
the closed politainer 180° upside down on the
console (10)
so that the yellow
belt ring (63)
is situated under the console.
Connection of the brine politainer
09. Brine politainer
10. Console
61.
Connection pin
62.
Politainer connection with connection
sleeve canister connection
63.
yellow belt ring
Connect the device on the main switch. The device is then ready to use.
Figure 18, politainer connection with connection plug
63
61
62
Figure 17, politainer connection
61
62