20
Completing A Fusion
After selecting a fusion style, a verification screen similar to the one shown below will be displayed:
This screen shows :
• The type of cycle selected (
Standard
on the left screen,
Preheat
on the right screen).
• The type of fitting(s) selected (In this case, 1.5" CF couplings).
If the operator chose Manual
Fusion, the text "CPLG UNKNOWN" will be displayed on the second line.
• The fusion time (In this case, 1 minute 30 seconds).
NOTE:
If a Preheat Cycle is required, the processor will display the required preheat time on the last
line of the display. See page 32 for details regarding the preheat cycle.
The
VERIFY SETUP
screen allows the operator a final opportunity to verify that the fusion param-
eters are correct and match the parameters specified by the fitting manufacturer before starting
the fusion.
Always pay close attention and verify the information on this screen is correct
before pressing START.
The processor will
BEEP
once per second and the text
"PRESS START"
on the bottom line of the
display will flash on and off.
Once you have verified that all measurements and parameters are correct, press the
START button
to begin the fusion.
Once the START button is pressed the fusion process will begin.
The fusion process begins with a Fitting Resistance Verification. The Rionfuser Electrofusion Proces-
sor will display a screen similar to the following:
VERIFY WELD DATA
CF 1 . 5"
1 min 30 sec
PRESS START
VERIFY PREHEAT DATA
CF 1 . 5"
1 min 30 sec
PRESS START
Failure to verify that the fusion
information is correct before
starting a fusion could result in
significant damage to personal
property, personal injury, and/or
death.
WARNING
!
VERIFYING FUSION
PARAMETERS
It is the responsibility of the operator to verify
that all the information displayed is correct per
the fitting manufacturer's recommendations
for using the attached fitting under the current
ambient conditions.