![Waterous AQUIS ULTRAFLOW Installation And Operation Manual Download Page 51](http://html2.mh-extra.com/html/waterous/aquis-ultraflow/aquis-ultraflow_installation-and-operation-manual_3639572051.webp)
51
|
56
Manually Priming the Concentrate Line
20%
50%
80%
20%
50%
80%
98
GPM
170.0
2000
64781
1943.4
112.0
< GAUGE
SOLUTION >
45
4,000
PRESSURE
RELIEF
DECK GUN 8”
REAR DRIVER /
DECK GUN 5"
PASSENGER 6"
DRIVER 6”
FRONT / REAR
CROSSLAY 1~3/4”
REAR PASSENGER
2.5"
#1 / #2 DRIVER
2~1/2”
#1 / #2
PASSENGER 2~1/2”
1
2
Use the illustrations and instructions to manually
prime the concentrate line. The system
automatically primes before operation. You can also
manually prime the system by pressing the prime
button until the system is primed.
Note:
For instructional purposes, the system
illustration only focuses on the specific
activity in the system that best conveys the
topic.
1 Press and hold the prime button until the
system is primed.
2 The system evacuates the air in the lines to
atmosphere as the concentrate fills the lines.
During prime operation a small amount of
concentrate will return to the on-board tank.
Make sure that the tank capacity is sufficient to
allow for normal priming operation.
You can also prime the system from an auxiliary
concentrate source. However, extended priming
from an auxiliary supply is not recommended as
this may overflow the on-board tank.
Summary of Contents for AQUIS ULTRAFLOW
Page 2: ......
Page 55: ...Notes 55 56...