Installation and connection
21.10.2015
13 / 60
Copyright
2014 by: WATERKOTTE GmbH. Subject to changes.
5
Installation and connection
5.1
Installation and connection of indoor unit
To make hydraulic connections, you must use the supplied material (con-
necting lines and gaskets).
During assembly of connecting lines, use an according tool as brace to
prevent damage to the heat distribution station.
Installation of the indoor unit must be performed on a flat and horizontal
surface.
Wall clearance (free space) in front: at least 1000 mm.
Due to the connections on the rear of the unit, the mounting distance to
the wall (rear, right side, left side) must be selected in such a way that
access is ensured in case of repairs.
Recommendation for good service accessibility: Wall clearance (free
space), left, right 400 mm. Wall clearance rear at least
300 mm.
Figure 1: Recommendation - wall clearance for installation
5.2
Environmental conditions for installation
When selecting the installation site, observe the minimum volume under
consideration of the refrigerant applied (as per EN 378-1).
The room must be dry. Room temperature should be b5 °C and
+25 °C. To facilitate maintenance, the use of a base plate is recommended.
To compensate for minor unevenness, we recommend use of an approx.
10 mm thick rubber mat.