Transport to installation site
21.10.2015
12 / 60
Copyright
2014 by: WATERKOTTE GmbH. Subject to changes.
4
Transport to installation site
Modules of the Basic Line 7010 series are delivered ready-to-connect with
metal cladding. The Basic Line Ai1 Air / Basic Line 7010 are delivered ready
for connection.
Since the heat pump module weighs 120 kg or more, for instance, at least
two people are required for transport.
The devices are mounted on top of each other only at the installation site.
During transport it must be ensured that appropriate means of transport are
used (lift truck, transport rollers, handcart).
It is crucial that the heat pump is transported upright!
Transport in tilted position (45°) is permitted only temporarily during inser-
tion. Horizontal transport results in oil displacement in compressor and can
cause damage to the heat pump during start-up.
After carton is removed or opened it is not permitted to tilt the module by
applying pressure to the pipelines or housing enclosure; this could result in
bent housing parts and pipelines.
4.1
Environmental conditions for installation (indoor module)
The room must be dry. Room temperature should be b5 °C and
+25 °C.
4.2
Residual head circulation pump (heating)
Residual head
circulation pump (heating)
- Hydraulic station BS Hyd 5010
- Indoor module Basic Line Ai1 Air
10 kW
∆
t=5K
6 m