OXISWIM MANUAL
P a g e
20 | 45
Figure 5.13
Figure 5.14
LEFT Peristaltic Pump HEAD (pH)
RIGHT Peristaltic Pump HEAD (hydrogen
peroxide or chlorine )
Repeat, so both tubes are now connected with one end joined to the chemical injection
point, and the other joined to the RIGHT-HAND SIDES (discharge sides) of the chemical
dosing unit pumps.
6.4.1 Connect chemical dosing unit to chemical supply tanks.
Ensure that the supply tanks are positioned no less than 1.5m (5ft) apart.
Summary of Contents for OXISWIM
Page 1: ...D U A L S A N I T I S A T I O N Installation and Operation manual Version 1 1 3 December 2022 ...
Page 11: ...OXISWIM MANUAL P a g e 11 45 INSTALLATION AND COMMISSIONING ...
Page 15: ...OXISWIM MANUAL P a g e 15 45 Oxiswim Typical Installation Layout ...
Page 28: ...OXISWIM MANUAL P a g e 28 45 OPERATION AND MAINTENANCE ...