![Wallenstein WP245 Operator'S Manual Download Page 37](http://html.mh-extra.com/html/wallenstein/wp245/wp245_operators-manual_870840037.webp)
6.16 Transporting
•
Fold up the splitter chute, and the lead-in and loader chutes.
Insert the lynch pin for the splitter chute.
•
Hook up the lead in chute lock arm and install latch pin.
•
Clean the machine. Dirt and debris can fall off affecting
other traffic. Remove any loose tools.
•
Make sure that the machine is securely attached to the tow
unit with a retainer through the 3-point-hitch arms.
•
Never allow riders on the machine.
•
Plan your route to avoid heavy traffic.
•
Comply with state and local laws governing safety and
transporting of machinery on public roads.
•
Do not exceed a safe travel speed. Slow down for rough
terrain and cornering.
01300
Fig. 44 –
Splitter Chute Lynch Pin
01225
Fig. 45 –
Chute lock arm and latch pin
Fig. 46 –
WP245 ready to transport
01298
WP245 / WP275
3-Point Hitch Firewood Processor
Operating Instructions
37