40ea manual
- 32 -
Things to note about the connections
The standard length of the fuel hose is 4 m (max 6 m). Cut the fuel hose to a length suitable for installation.
The lift height of the pump should be less than 2 m; preferably 0,5-1 m.
The fuel pipe must always have a filter.
Country-specific requirements
The standard fuel hose is plastic. Please observe the country-specific requirements with regard to the material for the
fuel hose / pipe, the fuel filter and the hose clamps. The inner diameter of a new replacement hose must be equal to the
inner diameter of the plastic hose.
Copper pipe and metal filters are available as accessories.
Fuel feed
If the lift height is outside the recommended 0,5-1 m, the fuel feed must be checked and, if necessary, adjusted. The
fuel feed must also always be checked, if parts of the fuel system, such as the pump or the electronics card, have been
replaced.
Fuel system adjustments are device specific. We recommend that the adjustment be carried out by an authorised
service shop.
Summary of Contents for 40ea
Page 4: ...40ea manual 3 Conformity with ecodirective Wallas 40EA conforms with ecodirective...
Page 11: ...40ea manual 10 Electrical connections of the device...
Page 12: ...40ea manual 11...
Page 13: ...40ea manual 12...
Page 19: ...40ea manual 18 Turn the heater of by sending 1234 R10...
Page 27: ...40ea manual 26 Wall lead through section view...
Page 30: ...40ea manual 29 Measurements for the hole are 516x328mm...
Page 39: ...40ea manual 38 5 Unplug the drill pump s hose and plug T branch...