wc_tx003863gb_FM10.fm
41
RT / RTx
Operation
4
Operation
4.1
Preparing the Machine for First Use
1. Make sure all loose packaging materials have been removed from the machine.
2. Check the machine and its components for damage. If there is visible damage,
do not operate the machine. Contact your Wacker Neuson dealer immediately
for assistance.
3. Take inventory of all items included with the machine and verify that all loose
components and fasteners are accounted for.
4. Attach component parts not already attached.
5. Add fluids as needed and applicable, such as fuel and engine oil.
6. Move the machine to its operating location.
Summary of Contents for RT82-SC3
Page 4: ...CALIFORNIA Proposition 65 Warning wc_tx004643en fm 4 Notes...
Page 8: ...Foreword RT RTx 8 wc_tx003861gb_FM10 fm...
Page 10: ......
Page 12: ......
Page 25: ...wc_si000902gb_FM10 fm 25 RT RTx Safety Information Notes...
Page 40: ...wc_tx003862gb_FM10 fm 40 Lifting and Transporting RT RTx Notes...
Page 56: ...wc_tx003863gb_FM10 fm 56 Operation RT RTx wc_gr012189 a b c d e f...
Page 122: ...wc_td000626gb_FM10 fm 122 Technical Data RT RTx Notes...
Page 151: ...RT RTx Schematics wc_tx003865gb_FM10 fm 151 14 Schematics Notes...
Page 178: ......
Page 180: ......