Operation
Shutting down
BA RD24_RD27 en 04
121
Drain and preserve the fuel system.
Fill the AdBlue®/DEF reservoir to 25%.
Check the coolant level and, if required, top it up.
Drain the engine oil and preserve the engine using running-in
preserving oil.
Check the gear oil level and, if required, top it up.
Drain the liquids from the tanks for water sprinkling, additive
sprinkling and the windscreen washer system.
Storage
Store the machine and machine components in well-ventilated,
lockable, temperature-controlled and dry rooms.
When storing outdoors, place the machine and machine components
on suitable underlays in order to protect them against moisture and
cover them using tarpaulins that open at the bottom. Secure the
tarpaulins using suitable lashings.
Recommissioning
Check the drive unit, auxiliary units, hoses, hose connections and
flange-mountings for leaks and/or escaping operating and auxiliary
materials. If there are any anomalies, repair or replace any affected
components.
Drain and dispose of the preserving liquids.
Fill pipe systems with operating and auxiliary materials e.g.: engine
coolant, engine oil, gear oil, AdBlue®/DEF, water sprinkling, additive
sprinkling.
Check and, if required, repair all of the components.
3.30.02
Permanently shutting down and disposing of the machine
WARNING
Dangerous operating materials!
Risk to health and the environment caused by operating materials that
have not been disposed of properly.
■
Dispose of operating materials in accordance with the applicable
safety and environmental regulations.
■
Wear personal protective equipment when disposing of the
materials.
If the machine is no longer designated or suitable for the intended use, it
must be decommissioned in accordance with the applicable regulations.
N
O
T
E
The work to permanently decommission the machine
requires expert knowledge and may require special tools and
equipment.
This work must only be carried out by trained specialists.
N
O
T
E
The work steps listed below are
NOT INSTRUCTIONS
. They
are a non-exhaustive list of examples of work that must be
carried out in order to permanently decommission the machine.
For precise information or for carrying out the
decommissioning, contact customer service.
Summary of Contents for RD24
Page 11: ...EC Declaration of Conformity BA RD24_RD27 en 04 11 EC DECLARATION OF CONFORMITY...
Page 25: ...Preface Type plate BA RD24_RD27 en 04 25...
Page 49: ...Description Drive unit diesel engine BA RD24_RD27 en 04 49 1 1 Diesel engine type plate...
Page 166: ...Tables Technical data 166 BA RD24_RD27 en 04...
Page 227: ......