Description
General view of machine
BA RD24_RD27 en 04
41
M
A
R
G
I
N
Expert inspection test badge
M
A
R
G
I
N
Maintenance overview
10 hrs; daily maintenance
The activities that are shown on the sign must be carried out on a daily
basis before starting up the machine – at least every 10 hours.
The check and maintenance work that is to be carried out may deviate
from what is shown, depending on the model and equipment of the
machine.
This is not an exhaustive representation of the activities. The sections
"Functional checks before starting work" and "Maintenance overview" in
this operating manual are binding and must be followed.
N
O
T
E
The sign is for informational purposes only. It should not and
cannot replace instructions/training from the operator on how to
handle the machine.
Summary of Contents for RD24
Page 11: ...EC Declaration of Conformity BA RD24_RD27 en 04 11 EC DECLARATION OF CONFORMITY...
Page 25: ...Preface Type plate BA RD24_RD27 en 04 25...
Page 49: ...Description Drive unit diesel engine BA RD24_RD27 en 04 49 1 1 Diesel engine type plate...
Page 166: ...Tables Technical data 166 BA RD24_RD27 en 04...
Page 227: ......