![Wacker Neuson G70 Operator'S Manual Download Page 39](http://html1.mh-extra.com/html/wacker-neuson/g70/g70_operators-manual_3129214039.webp)
G 50/G 70/G 85
Operation
wc_tx000483gb.fm
39
3.20.7
After engine starts, allow it to warm up for a few minutes and check
readouts on LCD panel. The
“TIME TO SERVICE”
interval will be
displayed. Make sure battery charging system, oil pressure and engine
temperature readings are within normal ranges.
3.20.8
Check that AC voltage is correct. Voltage can be fine-adjusted by
turning the voltage adjustment rheostat
(b)
on the metering panel.
3.20.9
Check frequency. Under no-load conditions, frequency should read
around 61.5 Hz, dropping to near 60 Hz as the generator load is
switched on.
wc_gr001677
Summary of Contents for G70
Page 2: ......
Page 14: ...Safety Information G 50 G 70 G 85 wc_si000158gb fm 14 2 6 Label Location...
Page 15: ...G 50 G 70 G 85 Safety Information wc_si000158gb fm 15...
Page 24: ...Operation G 50 G 70 G 85 wc_tx000483gb fm 24 3 Operation 3 1 Control Panels...
Page 46: ...Operation G 50 G 70 G 85 wc_tx000483gb fm 46 w c _ g r 0 0 0 5 1 0 a d c b...
Page 57: ...G 50 G 70 G 85 Maintenance wc_tx000484gb fm 57...
Page 59: ...G 50 G 70 G 85 Maintenance wc_tx000484gb fm 59...
Page 65: ...G 50 G 70 G 85 Maintenance wc_tx000484gb fm 65 G 50 G 70 Engine Wiring...
Page 67: ...G 50 G 70 G 85 Maintenance wc_tx000484gb fm 67 G 50 G 70 Engine Wiring...
Page 69: ...G 50 G 70 G 85 Maintenance wc_tx000484gb fm 69 G 50 G 70 Engine Wiring...
Page 73: ...G 50 G 70 G 85 Maintenance wc_tx000484gb fm 73...
Page 81: ...Mobile Generators Factory Installed Options wc_tx000380gb fm 81 Notes...
Page 90: ...Technical Data G50 G 70 G 85 90 6 4 Dimensions mm inches...
Page 91: ......