3.18 Terminal Connections
ALL CONNECTIONS TO THE TERMINALS MUST BE MADE BY A
TRAINED ELECTRICIAN.
BACKFEED FROM THE GENERATOR INTO THE UTILITY’S
DISTRIBUTION SYSTEM CAN CAUSE A SERIOUS INJURY OR
DEATH TO UTILITY WORKERS!
Improper connection of generator to a building’s electrical system can
allow electrical current from the generator to backfeed into utility lines.
This may result in electrocution of utility workers, fire or explosion.
Connections to a building’s electrical system must be made by a
qualified electrician and comply with all applicable laws and electrical
codes.
DANGER OF ELECTROCUTION! ALWAYS OPEN MAIN CIRCUIT
BREAKER AND SET ENGINE STOP SWITCH TO OFF “O”
BEFORE INSPECTING OR ATTEMPTING ANY CONNECTIONS TO
THE TERMINAL BLOCK! LETHAL VOLTAGE COULD BE
PRESENT ON THE TERMINAL LUGS!
DANGER
DANGER
Summary of Contents for G70
Page 2: ......
Page 14: ...Safety Information G 50 G 70 G 85 wc_si000158gb fm 14 2 6 Label Location...
Page 15: ...G 50 G 70 G 85 Safety Information wc_si000158gb fm 15...
Page 24: ...Operation G 50 G 70 G 85 wc_tx000483gb fm 24 3 Operation 3 1 Control Panels...
Page 46: ...Operation G 50 G 70 G 85 wc_tx000483gb fm 46 w c _ g r 0 0 0 5 1 0 a d c b...
Page 57: ...G 50 G 70 G 85 Maintenance wc_tx000484gb fm 57...
Page 59: ...G 50 G 70 G 85 Maintenance wc_tx000484gb fm 59...
Page 65: ...G 50 G 70 G 85 Maintenance wc_tx000484gb fm 65 G 50 G 70 Engine Wiring...
Page 67: ...G 50 G 70 G 85 Maintenance wc_tx000484gb fm 67 G 50 G 70 Engine Wiring...
Page 69: ...G 50 G 70 G 85 Maintenance wc_tx000484gb fm 69 G 50 G 70 Engine Wiring...
Page 73: ...G 50 G 70 G 85 Maintenance wc_tx000484gb fm 73...
Page 81: ...Mobile Generators Factory Installed Options wc_tx000380gb fm 81 Notes...
Page 90: ...Technical Data G50 G 70 G 85 90 6 4 Dimensions mm inches...
Page 91: ......