4.5 - GREEN MACHINE
™
- North America - Installation, Operation, Maintenance, & Troubleshooting Manual
Appendix B
Page 219
GREEN MACHINE Start-
Up Form, continued…
STEPS
DESCRIPTION
CHECK AFTER
COMPETION
ITEM CHECKED
11.
Below are the required pictures to be submitted with Appendix B:
11.1
Picture of the entire vent riser.
Pictures to
Up-Load
11.2
Picture of the vapor piping at the GREEN MACHINE showing
the ¼” diameter copper drain line.
11.3
Picture of the valves locked in the open position.
11.4
Picture of the VST Control Panel PLC Main Screen.
11.5
Picture inside the VST Control Panel, inside the front door.
11.6
Picture inside the VST Control Panel, inside the panel.
11.7
Picture inside the VST Control Panel, showing the field wiring
connections.
CAUTION: The locking ball valve handles at the GREEN MACHINE inlet, return, and outlet must not
be removed.
All items have been
checked and verified:
___________________________________________
___________
Name (Print)
Date
GREEN MACHINE START-UP CHECK-OUT:
•
Upon completion, the Start-Up Contractor must submit this signed and dated form on-line
to VST.
•
After the form is complete, Click the Submit button at the end of the form.