4.5 - GREEN MACHINE
™
- North America - Installation, Operation, Maintenance, & Troubleshooting Manual
Chapter 1: GREEN MACHINE
™
Installation Instructions
Page 32
1.14
Snapshot of Site Requirements
Local Air Pollution Control Districts
•
Gasoline stations must contact the local/national authorities for specific requirements.
•
Permits may be required to modify a gasoline station.
Installation Requirements
•
The GREEN MACHINE
must be within 100 feet of the Vent Risers regardless of the
installation location.
•
VST requires a minimum slope of ¼” per foot on all vapor
-piping away from the GREEN
MACHINE to the Vent Risers or to any other UST connection.
•
A minimum clearance of 18
”
around the GREEN MACHINE for maintenance and testing is
required.
•
The GREEN MACHINE must be protected from damage: Install bollards or other suitable
method to protect the GREEN MACHINE.
Automatic Tank Gauge, Fuel Management Controls
•
Must have an appropriate automatic tank gauge fuel measurement control with an overfill
alarm contact installed.
•
The GREEN MACHINE Controller will use the overfill alarm contacts to shut OFF the GREEN
MACHINE so gasoline cannot enter the GREEN MACHINE in case of an overfill. If gasoline
enters the GREEN MACHINE because of an overfill, the warranty will be voided.
VST Control Panel
•
VST Control Panel completely powers the GREEN MACHINE via one 115 VAC, single-phase,
20-amp breaker.
•
The VST Control Panel arrives from the factory internally pre-wired and pre-tested.