4.5 - GREEN MACHINE
™
- North America - Installation, Operation, Maintenance, & Troubleshooting Manual
Appendix A
Page 213
STEPS
DESCRIPTION
CHECK AFTER
COMPLETION
RESULTS
Reference Chapter 2 for the Piping Installation:
~
~
1.
Check that all the piping, valves, tees, unions, and riser
are installed as shown in
Chapter 2, Piping
PIPING IS
COMPLETE
2.
Make sure the three valves located at the GREEN
MACHINE are locked in the Open position.
ISOLATION VALVES
ARE LOCKED OPEN
3.
Make sure the piping connected to the GREEN
MACHINE
slopes a minimum of ¼” per foot towards the
vent risers, and that there are no traps.
PIPING SLOPE AND
TRAPS
4.
Make sure
the ¼” drain line is installed correctly
between the vapor inlet and vapor return.
¼” DRAIN LINE IS
INSTALLED
Reference Chapter 3 for the Electrical Installation:
~
~
5.
Check that all the electrical connections are complete,
correct, and tight at the VST Control Panel and at the
GREEN MACHINE Internal Junction Box.
ELECTRICAL IS
COMPLETE
6.
Turn OFF the Maintenance Switch on the front of the
VST Control Panel. The Maintenance Switch Alarm will
be active when power is turned ON.
(When power is applied to the Control Panel, the
GREEN MACHINE cannot operate with the
Maintenance Switch OFF regardless of UST pressure.)
MAINTENANCE
SWITCH IS TURNED
OFF
7.
Turn the GREEN MACHINE breaker ON at the Main
Distribution Panel.
MAIN POWER IS
ON
8.
Check that the VST Control Panel wiring is connected to
the station Emergency Shut-OFF (ESO) switch.
ESO IS CHECKED
9.
Check that the VST Control Panel wiring is connected to
the TLS-350 or TLS-450 Overfill Alarm.
OVERFILL IS
CHECKED
10.
Check that the Power Switch at the GREEN MACHINE is
installed and working, and is turned ON.
SAFETY SWITCH IS
CHECKED
11.
Turn OFF power at the VST Control Panel at the Power
Switch on the front of the Control Panel and lock the
switch OFF with the carabiner clip.
CONTROL PANEL IS
OFF
All items have been checked
and verified:
_________________________________________
___________
Name
Date
POST-INSTALLATION GREEN MACHINE
™
CHECK-OUT:
•
Upon completion, the General Contractor must submit this signed and dated form on-line to VST.
•
After the form is complete, Click the Submit button at the end of the form.