4.5 - GREEN MACHINE
™
- North America - Installation, Operation, Maintenance, & Troubleshooting Manual
Chapter 1: GREEN MACHINE
™
Installation Instructions
Page 37
1.15.5
Electrical
1. Does the GDF have 1-Phase 115V
available?
Yes
No
2. Are there any existing conduits at or near
the proposed VST GREEN MACHINE
location (for example: lights, signs,
vacuum)?
Yes
No
3. Available breaker space for a 115V
1-phase circuit?
Yes
No
4. Will a sub-panel need to be installed?
Yes
No
1.15.6
Additional Documentation
•
Include photos of each of the above items as needed.
•
Draw a sketch of the GDF layout. Include:
a) The location of the vent risers
b) Tank pad
c) Dispensers
d) Building with the electrical panel location
e) Property lines
f)
Any existing conduits near the proposed GREEN MACHINE location.