4.5 - GREEN MACHINE
™
- North America - Installation, Operation, Maintenance, & Troubleshooting Manual
Chapter 7: Maintenance Procedures
Page 96
Maintenance Procedures, continued…
5.
Rubber Flange Sleeve Replacement Procedure:
See Section 7.5.
To keep the GREEN MACHINE operational, replace the rubber flange sleeve yearly.
6.
Cleaning the Control Valves:
See Section 7.6.
Cleaning the control valves will reduce valve noise. Check the valve components for
wear and damage and keep the valves operational for a longer period of time.
7.
Check the Air Outlet for Liquid Condensate:
See Section 7.7.
Check annually for liquid condensate in the air outlet pipe.
8.
Check the Separator for debris:
See Section 7.8
.
Figure 7-1: VST PLC Main Screen w/no alarms