31
ENGLISH
Fig.10 and Fig.11
To create the air channels, perform core drilling using a suitable cutter. It is always preferable to keep a slight slope
outward.
The useful dimensions of the two channels are shown in the paragraph “Fixing the product to the wall”.
Fig. 12
After core drilling, insert a rigid PVC tube for construction inside each channel. Complete sealing work with the necessary
masonry works.
Fixing the product to the wall
The product is to be mounted to the wall by means of a hook on a suitable steel support plate (supplied).
The wall must be solid and not subject to vibrations.
Proceed as follows to fix the wall mounting plate:
Fig. 13
• Position the plate on the wall;
• Use the tool able to verify verticality and horizontality of the metal plate;
• Mark the holes with a pencil;
Fig. 14-15
• Drill at the traced holes.
• After drilling, insert the dowels into the wall and proceed with fixing operations by means of screws.
To fix the plate, choose the type of expansion dowel best suited for the type of wall.
Installation of the electrical system can be carried out with a trace system or surface: See “Electrical connections”.
11
11
ø
125 mm
12
12
1 ÷ 3°
10
10